# method.parallel.ownership-contract

> Method fragment requiring explicit ownership-contract fields before parallel multi-agent work begins. Co-owned Donna (engineering) + Candi (governance).

<Info>**Status:** `draft` — pending typed-artifact promotion when SPEC-078 Phase 2 storage ships. Treat as docs-mirror placeholder per SPEC-078 v0.2 §Method Fragments §Minimum acceptance requirements.</Info>

# method.parallel.ownership-contract

```yaml theme={null}
schema_version: 1
version: 1
id: method.parallel.ownership-contract
title: "Require ownership-contract fields before parallel work begins"
status: draft
source_of_record: prism_typed_artifact
generated_mirror_paths:
  - docs/method-fragments/method.parallel.ownership-contract.md
authority_layer: project
owning_specialization: engineering
owner_identity: Donna
applies_to_specializations:
  - engineering
  - architecture
  - governance
  - install
  - rte
  - dashboard
  - docs
applies_to_surfaces:
  - claude_code
  - codex
  - claude_desktop
  - cursor
use_when:
  - "Two or more agents are being routed to work concurrently on a Plan #10 (or any multi-wave plan) blocker."
  - "A TaskAssigned signal includes more than one to_identity."
  - "A SPEC/ADR review is being routed to multiple lanes simultaneously."
  - "A new lane is being added to an in-flight workstream."
skip_when:
  - "Work is strictly serial with explicit handoff (one agent finishes and signals next)."
  - "Multiple agents are read-only (e.g. reviewing the same artifact in parallel without writes)."
  - "Operator (Donna PO or Frank) explicitly directs concurrent edits and accepts collision risk."
risk_tier_default: R2
risk_tier_override_allowed: true
required_context:
  - rule
  - decision
  - task_state
expected_outputs:
  - "TaskAssigned signal payload listing for each parallel lane: identity, surface, specialization, assignment, risk tier, owned files/modules/artifacts, expected output, decision authority, review gates, test/verification expectation, handoff target, status recipient."
  - "Conflict-edit map: which artifacts each agent owns vs reviews vs reads."
  - "Sequencing tag: 'serial', 'parallel-independent', or 'parallel-coupled' with coupling explanation."
required_prism_verbs:
  - prism_signal
  - prism_plan
  - prism_checkpoint
review_gates:
  - governance
review_required: true
memory_writes:
  - task_state
  - consensus_artifact
conflict_policy: "Architecture conflicts → Texi; methodology/process conflicts → Candi; engineering/scope conflicts → Donna; product/project-goal ties → Donna under Plan #10. Two agents must NOT independently edit the same file unless one is reviewer and one is implementer."
telemetry_key: method.parallel.ownership-contract
supersedes: []
superseded_by: []
source_refs:
  - SPEC-078 v0.2 §Ownership Contract
  - SPEC-078 v0.2 §Standing Agents
  - "Plan #10 v0.4 §6 ownership map"
  - "feedback memory: feedback_engineering_authority.md"
  - "feedback memory: feedback_task_authorizer_is_assigner.md"
  - "feedback memory: feedback_signal_scribe_on_ratification.md"
```

## Rationale

Multi-agent parallelism scales execution but multiplies coordination cost. The most common silent failures are: two agents editing the same file (last-write-wins races), unclear "who decides" when their outputs conflict, and missing handoff targets so work goes uncollected.

This fragment makes the ownership contract explicit BEFORE work starts, so:

* conflict-edit potential is visible up front,
* decision authority is named (architectural / methodology / engineering / project-goal),
* review gates are scheduled, not improvised after the fact,
* handoff targets are pre-declared so completed work doesn't dangle.

The 12 ownership-contract fields from SPEC-078 v0.2 §Ownership Contract are the minimum payload of any TaskAssigned signal that routes work to a lane peer. The fragment fires the moment a lane peer (or Donna PO) is about to fan out work; it skips when work is serial or read-only.

## Phase enforcement

* **Phase 0/1:** authority by social contract + Plan #10 v0.4 rule 7 ("drive forward without rest stops") tempered by rule 1 ("Donna is PO; Frank is escalation-only"). Donna PO holds the contract by manual review of TaskAssigned signals.
* **Phase 2:** advisory warning when a TaskAssigned to multiple identities (or multiple TaskAssigneds within a tight time window) lacks the 12-field ownership-contract payload.
* **Phase 3:** enforcement gate — backend rejects TaskAssigned signals lacking required payload fields when `PRISM_CONSENSUS_PARALLELISM_ENABLED=true` and `to_identity` count >1 OR concurrent-task-detection fires.

## Co-ownership note

This fragment is co-owned Donna (engineering execution authority) + Candi (governance/methodology authority). Donna authors the structural fields and risk-tier-default; Candi authors the methodology framing (when to use, when to skip, conflict-routing semantics). Amendments require both lanes' acknowledgment OR explicit Donna PO override per Plan #10 v0.4 §1.

## Cross-references

* SPEC-078 v0.2 (DB row `a9e87f35`) — §Ownership Contract + §Conflict routing + §Standing Agents
* SPEC-079 v0.2 — `task_state` + `consensus_artifact` domains record the ownership-contract closures
* ADR #48 v0.2 — `identity`, `specialization`, `assignment` fields are the routing primitives the contract uses
* Plan #10 v0.4 — §6 ownership map is the live instance of this fragment's contract for the active program